Curtain Wall Façades Explained

The glass-and-aluminium skin you see on Accra’s office towers and corporate headquarters is a curtain wall — and it is one of the most misunderstood and most cost-significant elements of a commercial building. If you are specifying or pricing a commercial project, understanding the curtain wall is how you avoid both an under-specified envelope that fails and an over-specified one that wastes budget. This article explains it.

What a Curtain Wall Actually Is

A curtain wall is a non-structural outer envelope — typically aluminium framing infilled with glass or panels — hung from the building’s structural frame. It carries no floor or roof load; it carries only its own weight and resists wind, water, and solar gain, transferring those loads back to the structure.

This is the key distinction from blockwork: a blockwork-and-render wall is built up from the ground and often load-bearing or infill within the frame; a curtain wall is a separate, engineered cladding system fixed to the frame floor by floor. They are different products with different costs, different programmes, and different specialists.

What a Curtain Wall Does

A well-designed curtain wall manages several things at once:

What Drives the Cost

Curtain walling is a high-value envelope element, and its cost is driven by specification, not floor area:

Because of this, a curtain wall’s cost cannot be read off a rate. It is measured and priced in the Bill of Quantities like every other element — see Commercial Construction Cost & BoQ.

Why Quality Decides Whether It Performs

A curtain wall is only as good as its design, fabrication, and installation. The failures that appear years after handover — water ingress, condensation, failed seals, thermal noise — almost always trace back to a system specified or installed without the right discipline. In Ghana’s hot, humid, rain-driven climate, the envelope is tested hard, which makes proper specification and installation non-negotiable.

A serious commercial build treats the curtain wall as an engineered system: designed to a defined performance, fabricated to that design, and installed by a specialist — all built to L.I. 1630 and the Ghana Building Code (GS 1207:2018), with registered GhIE engineering input where the structure and façade interface.

Get the Envelope Right From the Start

The curtain wall is one of the elements where a low number up front becomes an expensive problem later. Specify it properly, price it in a measured BoQ, and install it with a contractor who treats it as engineering — not decoration.

A classified, credentialed contractor since 1977, Construct GH delivers commercial buildings end-to-end — structure, envelope, and fit-out — across Accra, Kumasi, Takoradi, and Lomé, Togo. Request a capability statement: +233 23 063 0028.