
The problem
Defects discovered after occupation cost multiples of defects caught at the stage they were built.
Our approach
Multi-stage inspection with written acceptance before each stage closes.
Stage-by-stage quality control on Accra commercial builds — each stage inspected and accepted in writing before the next begins.
Quality Assurance Inspection, Accra
Construct GH inspects at every stage — setting out, reinforcement, concrete, envelope, services, finishes — and closes each with a written acceptance before the next begins. The inspection records accumulate into the handover file, so the building’s quality is documented rather than asserted. It is the discipline institutional facility audits expect to find.
